Answer Posted / pankaj kumar goel
A temporary platform or system of platforms used for support; scaffolding.
2. The process or manner of putting on a play on the stage.
3. The act of jettisoning a stage of a multistage rocket.
4.
a. The operation of stagecoaches as an enterprise.
b. Travel by stagecoach.
| Is This Answer Correct ? | 0 Yes | 3 No |
Post New Answer View All Answers
How much cement,sand,bricks and water needed for 1square metre brick work?
How does a traffic light signal work ?
which has high compressive strength between hollow block and brick masonry?
what is the formula to find the diagonal shape stirrups?
how to find quantity of concrete in PCC M15
How to check slab shuttering level.? Or check list for slab ?
what is constat for brickwork
can any one explain bar bending schedule of bems and columns and slabs ??
which method is used in semi-rigid connection design??
how to stop beam concrete between column
what is parametre for M25 after 7 days strength
How can you distinguish between sorption, absorption and adsorption?
For the symmetrical continuous beam shown in figure, Prestressed with a force P = 1500 KN along parabolic curve as shown, compute the extreme fiber stresses over the central support for the uniformly distributed load of 24 kn/m. Use load balancing method.
What is hybrid foundation?
How many types of slabs are there & how to design it?