I used Etabs software to analyse a high-rise building. And
I want to use templated UBC-codes inside to calculate the
Seismic load. My question is: whether or not I have to
control the seismic load by base shear load which is manual
calculation? (just for more clarification: I can control
this by input the scale factor into Eartquake definition in
Etabs)
I would highly appreciate your answer.


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Civil Engineering Interview Questions

how to do sudoko puzaals?

0 Answers  


RCC colums of 15"X9" each, roof height 10.5'ft, total pillars 12 nons. Span between pillar to pillar is 14/20/20 length wise and 17/14 width wise. Total Slab area 2400 sft and plinth area is 1900 sft. beams are 12"X12". kindly calculate load factor per sqft.

2 Answers   ABS Construction, L&T,


What is meant by cad?

0 Answers  


With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

0 Answers   Power Plant,


WHAT IS TEAM SIZE IN CONSTRUCTION WORK

2 Answers  






1sqm=? wood

2 Answers   Ackruti, Nagarjuna Construction, SRS Group,


What is the strength of normal brick in india

3 Answers  


how can we differentiate the KOTA STONE and SHAHABAD STONE by vision?

2 Answers   JMC Projects,


# 1, What should be the Maximum Water observation of wood # 2. Is Alluminium is an alloy or not

2 Answers   Brigade,


how you calculate the qty. of cement ,sand,aggregate from proportion 1:2:4 M15

5 Answers  


Specific gravity of cement?

0 Answers  


Difference between wbm and gsb in road construction

4 Answers   CPWD, GSB, Ircon, JMC Projects, L&T, RD,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5084)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16631)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1094)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)