At which place Construction joint should provide in slab
and Beam at the time of casting.
Answers were Sorted based on User's Feedback
sir when can we expect the AEE results and when will be the interviews sheduled please guide us in this regard thanking you
07. 4 main points about check list for rebar works are– ––
What is the strength of Steel Fe 415 and Fe 500
1 Answers Aditya Constructions,
Pls help me to arrive the rates for centering shuttering for highbay using H-frames?
function of stirrup in rcc beam & column?
2 Answers KMDA-Kolkata Metropolitan Development Authority, TK Group,
How much snowcem required per sq. Meter area
3 Answers Bhushan Power Steel,
How we can calaculate materials required for block work(1m3) block size 33cm x 20 cm x 17 cm, mortar 1:6
what is permissible IRC limits of silt content in river sand in India
How many number of cement bags per running metre are required to cast pileof M-20 grade
What is high adherence steel bar? I have a general specification which refers to High Adherence steel bars, coils and meshes to BS EN 10080 and BS 4449 or BS 4483. Is this just general re-bar or is there something different about it? The spec originated in France.
How to calculate the Quantity of Steel for Footing?
how to calculate mivan shuttering matrial
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)