How much quantity of water required for curing of:
1) For concrete of 10cu-m or 10sq-m
2) For blockwork of 10sq-m
3) For plastering of 10sq-m
No Answer is Posted For this Question
Be the First to Post Answer
Project at andheri west mumbai total area of 116000 sq ft near by..Please help me out for quotation plan is ready basic details are with me , please help me out .I will mail u in autocad also.
how to calculate the concrete mix m30 by volume
Why provides hook of stirrups only ones side?
What is the unit weight of cement,sand,Brick,Reinforcement concrete
Can we use PPC cement for RCC works? Upto which grade it can be used?
How to test the quality of Ready Mix M20 concrete (1:1.5:3) before casting at site when lorry arrives? Are there any methods?
hi, i am appearing in HPCL(CIVIL ENGG.)exam. plz send me placement paper of this exam if u are having
which is code used for ppc cement
how to calculate rate analysis of M25 grade concrete
8 Answers Nagarjuna Construction, Simplex,
how to calculate sand, aggregate and cement in m25 concrete?
2 Answers CCL Products, Western Infrastructure,
what are the criteria for choosing the span for the bridge (highway bridge)
A rock anchor 3 1/2” in diameter is placed in rock. The which has an allowable shear strength of 1200 psi. Determine the required anchorage length to safely carry a 80 ton load using a 2.0:1 F.S
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)