What is ratio if m30

Answers were Sorted based on User's Feedback



What is ratio if m30..

Answer / rick

M30 is design mix concrete..and the ratio of cement,FA & CA should be calculated as per the specification given by IS 10262:2009

Is This Answer Correct ?    1 Yes 0 No

What is ratio if m30..

Answer / santosh joshi

1:1:1

Is This Answer Correct ?    1 Yes 0 No

What is ratio if m30..

Answer / tummala

1:1.5:3

Is This Answer Correct ?    3 Yes 4 No

What is ratio if m30..

Answer / ajay

1:1.5:2

Is This Answer Correct ?    0 Yes 3 No

What is ratio if m30..

Answer / ravikumar

1:1:2

Is This Answer Correct ?    7 Yes 11 No

What is ratio if m30..

Answer / ruchita raj

1:1:1

Is This Answer Correct ?    3 Yes 11 No

Post New Answer

More Civil Engineering Interview Questions

wat is six sigma course ? is it good for civil engineers . wat is pmp certification ? is it good for civil engineers .

1 Answers   CCCL,


How to testing voids of filled aggregate in bitumen mix design

1 Answers  


WAS PUMP MODEL WXB DESIGNEDIN ACCORDING API 610 STANDARD?

1 Answers  


how many bags of cement required in neat cement finish per square metre

3 Answers   NMDC,


The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.

1 Answers  


for 32 dia (EQR HYSD steel) bar how much deduction for 45 and 90 degree band

1 Answers   Aecom,


I what know about life time of frp tank plz explain about it specifications & other details

1 Answers  


What are the different grades of concrete ?

3 Answers  


What do you mean by tolerance factor of concrete ?

1 Answers  


1)What's are the diff. types of column based on loading? 2)Is there any difference bitween Development length & Anchorage Length? 3) What is the basic diff. between one way & two way slab? 4) Where should use OPC & where should PPC?

3 Answers   TPSC,


Mujhe koi ye bta do ki 1.54 hi ku lete h material ki quantity niklne ke liye Sab jgha dhund liya bt samj nhi aaya mujhe koi alag aalag krke smjao ki cement m aggr. Dust m itne % wet or dry % hoti h fir kaise kaise 1.54 aaya kha se aaya smjao koi pls m confuse hu my calling nd wts app no. Is +919034604938

2 Answers   ADP,


Floor to floor high of domestic building is 3m design a quarter turn staircase starting assume taken give a suitable diagram of it?

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)