why & what is perchatage we are using fly ash in concrete?
No Answer is Posted For this Question
Be the First to Post Answer
lap lenth
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
What is Current Shuttering rate (labour + materials) for Columns, Beam & Slab on Item rate basis ?
How do you compute moisture correction using the parameters gathered from Nuclear Density Gauge Apparatus and the moisture contents results from the lab.?
What is IS ?
what is thumb rule exactly?
How to calculate soil bearing capacity of soil?
what are the checks to be performed while fixing a door and a window frame..at site??
whch is the grade of OPC
what is mean by bulking of sand?
11 Answers CCCL, Kanakia Group,
how many meters for brad gauge?
How u can calculate the Octagon ring distance from center of raft in 275 mtr chimney slipform errection? cantact no:0993455097
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)