I have an plot with area 35*47 = 182.77 sq yards.
Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item



I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with ..

Answer / Gori Shanker Rathaur

Cost estimation for a G+2 house with a total built-up area of 2700 sq ft (1350 sq ft per floor) may vary greatly depending on factors such as location, materials used, and contractor fees. Here's an approximate cost breakdown based on Indian construction industry standards:nLand cost: INR 1 crore - 6 croresnFoundation: INR 4 lakhs - 8 lakhsnStructure (Building material + Labor): INR 5 lakhs - 12 lakhs per floornElectrical wiring and plumbing: INR 3 lakhs - 6 lakhs per floornInterior finishing: INR 4 lakhs - 8 lakhs per floornTotal estimated cost: INR 2.5 crores - 10 crores

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

how much sand requires for Light weight blocks for 100sqft

1 Answers   Bahria Town, NCC,


whatis the minimum strength required for M-25 grade concrete in 14days compressive test? What is the procedure of calculation?

1 Answers  


What is meaning of FREE STANDING STAIRCASE ?

1 Answers   UPCL,


how calculate cutting length of stell in slab and column? give brif discussion with formula?

3 Answers   ATS, Gammon, Pegasus,


We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?

1 Answers  


Life of Rcc is taken as 100 years. What will be the life of structure after 10 years. will the strength of concrete increases or decreases.

7 Answers  


which is cost effective Steel Structural or Concrete Structure building?

3 Answers  


what is polity

1 Answers  


How to check percentage of bulkage of sand in RCC?

4 Answers  


how do you calculate the quantity of steel,cement for plinth beam. (example size 41'*0.58'*1.08')

1 Answers  


what is the creep in concrete

4 Answers   L&T,


Stander Size of Brick

11 Answers   Unitech,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)