Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


I need to know the productivity of meason/labour/barbender/carpenter while doing work like Shuttering, reinforcement steel, brick work, earth work?



I need to know the productivity of meason/labour/barbender/carpenter while doing work like Shutterin..

Answer / javed

1) Excavation over areas (hard/dense soil),depth up to 1.5m and removal (up to one meter from edge)

M3


Mate

Labour


0.06

0.62


_

_
2) Excavation in trenches (soft/ loose soil),for foundations not exceeding 1.5m in width and for shafts, wells, cesspits and the like, not exceeding 10m3 and on plan, depth up to 1.5m and removal(up to one meter away from edge)

M3


Mate

Labour


0.05

0.50


_

_
3) Returning, filling and ramming of excavated earth in layers not exceeding 20 cm in depth, watering, well ramming and leveling, lead up to 50m

M3


Mate

Labour

Bhisti


0.02

0.25

0.02


_

_

_
4) Concrete :

Mixing by machine (mixer) at banker, cement concrete (with 20mm graded coarse aggregate)


M3


Labour

Bhisti

Mixer operator

Mixer


0.50

0.10

0.07

0.07


_

_

_

_
5) Mixer mixed cement concrete

M3


mason

Labour

bhisti

mixer operator

mixer

vibrator


0.10

1.63

0.70

0.07

0.07

0.07


_

_

_

_

_

_
6) Reinforced cement concrete in situ in foundations, footings, bases for columns, etc excluding form work and reinforcement

M3


mason

Labour

bhisti

mixer operator

mixer

vibrator


0.17

2.00

0.90

0.07

0.07

0.07
The constants for items include mixing, pouring, consolidating and curing. This does not include fair finish.
7) Reinforced cement concrete in situ in suspended floors/roofs excluding form work, and reinforcement.

M3


mason

Labour

bhisti

mixer operator

mixer

vibrator


0.24

2.50

0.90

0.07

0.07

0.07


_

_

_

_

_

_
8) Mortars :

Mixing by hand, cement mortar of any mix/proportions


M3


Labour

Bhisti


0.75

0.07
Labour required will be approximately same for different mix proportions.
9) Brick work (straight walls) :

Brick work in walls exceeding one brick thick, in cement / lime mortar




M3


mason

Labour

bhisti


0.94

1.80

0.20
The constants include labour involved in scaffolding.
10) Brick work in walls, one brick thick, in cement/lime mortar

M2


mason

Labour

bhisti


0.25

0.40

0.10
The constants could be adopted for brick work with any mix or mortar.
11) Formwork :

a) fabrication and erection with all supports, struts, braces, etc, and dressing with oil as cleaning of formwork :

1) rectangular column and walls

2) suspended floors/roofs

3) sides and soffits of beam


M3

M2

M2


Carpenter

Labour

Carpenter

Labour

Carpenter

Labour


0.25

0.20

0.23

0.20

0.30

0.20


_

_

_

_

_

_
12) Reinforcement:

Bar reinforcement including cutting to length, hooked ends, cranking or bending, hoisting and placing in any position, binding wire and holding firmly so as not to be disturbed while placing and ramming of concrete


Quintal


Bar bender

Labour


1.00

1.00


_

_
13) Plastering and pointing :

a) 15mm thick cement plaster to ceiling including mixing of mortar.

b) 15mm thick cement plaster on brick walls (exterior) including mixing of mortar

c) Tuck pointing to random rubble masonry in cement mortar including mixing mortar.


M2

M2

M2


mason

Labour

bhisti

mason

Labour

bhisti

mason

Labour

bhisti


0.08

0.10

0.10

0.06

0.10

0.10

0.10

0.15

0.10


_

_

_

_

_

_

_

_

_
14) Damping proof course :

a) Laying damp proof course 40mm thick cement concrete including form work and fair finishing to edges and mixing.


M3


Mason

Labour

bhisti


0.10

0.10

0.01

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

hi i am working in a civil Lab .....they asked me to find out the compressive strength of concrete cubes after 7 days of curing....the value of load on CCT machine is 205KN how to convert it to Kg/cm2 ....plzz help me...........

6 Answers  


which type of crust is best suitable to develop flexible pavement in rural roads i.e either with wet mix macadam or Water Bound Macadam and its reasons.

0 Answers  


Define What is unit weight of normal concrete?

0 Answers  


WHAT IS THE IMPORTANCE OF FLY ASH BRICK?

2 Answers  


What in your past experience or education prepares you for the position for which you are applying

0 Answers  


What is GSB gradation

0 Answers  


yasser arfatcompleted his degree in civil from which university

0 Answers  


How to Concrete cube test method and required result in 3days & 7days & 28 days, for all grade of concrete which refer the is code no.

3 Answers  


What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)

0 Answers  


suppose that  156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.

0 Answers   Progressive,


TELL US ABOUT A TIME WHEN YOU FAILED TO MEET A DEAD LINE. WHAT WERE THE REPERCUSSIONS?

0 Answers  


how the centre of gravity is used in construction?

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)