If at site iam supposed to get M30.But by mistake i got M20
mix. How could I differentiate the mix before placing?
Answer Posted / chouhan
Dear
I dont think its useful instead of M30 to put M20 becose u have difrent like M20 is 20N/mm2 and M30 is 300n/mm2.
If you have any other solution pls share with so we can also use it on site.......... off course should get approval before apply.
| Is This Answer Correct ? | 0 Yes | 6 No |
Post New Answer View All Answers
I am a civil engineering student and going to attend interview in this week in an IT company.Will they ask me questions about my area of interest or cs
Explain the different types of roofing systems?
can any one explain bar bending schedule of bems and columns and slabs ??
What is an ice dam sock?
by which materials we can prepare circular shuttering with tentative cost of material(rate analysis)
How to come 1.54 from dry to wet concrete?
What is standard Sand? What is Regime condition? What do you mean by the core trench in Earthen Dasm? What is soundness test for cement? When negetive shear force takes place in a R.C.C member?
how to check and keep control on the wastage of material at site
how many mason and labaur work for a 1 brass bricks plz let me know the calculate & how to made calculation for this and whats the formulas for this?
For Wet Mix Mecadam design what is Optimum moisture content
What is meant by cartesian coordinate system?
How did street originate in the plumbing term street ell?
How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?
What is quantity of cement and sand required for 2000sqft of tiling?
Define What is a kip?