If at site iam supposed to get M30.But by mistake i got M20
mix. How could I differentiate the mix before placing?

Answer Posted / pramod

In case of this thing u cannot differentiate the mix before
placing. If this is possible then client also check it out
before placing.

Is This Answer Correct ?    4 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to convert cement, sand aggregate quantity from M3 to kg with full description?

1585


What is Critical path in Ms-Project ?

687


How much sand and cement requirement for 1 SQM 125mm thickness Brickwork

93


Design a built-up column carrying an axial load of 1200 KN. Its length is 8m and it is effectively held in position at both ends and restrained against rotation at one end. Assume yield stress of 250 mpa

1739


how much is the maximum compressive strength of soil cement and soil-cement-microsilica .

1812






What are moment of inertia and its importance in civil engineering?

688


What are the responsibilities of a site manager?

616


What is the difference between Fe 500, Fe 500 D and Fe 515.

3656


why do we provide haunches in rcc box or underpasses?

2467


how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.

3321


150mm bricks size how many use 4.14 m3

1399


What will be weight of 0.5mm GI sheet per sq.ft?

16667


what is the water cement ratio for plastering

1153


Are you ready to relocate with your immediate family to United States as a new employee?

4867


how do you stabilize a waterlogged area in road construction

6299