If at site iam supposed to get M30.But by mistake i got M20
mix. How could I differentiate the mix before placing?
Answer Posted / pramod
In case of this thing u cannot differentiate the mix before
placing. If this is possible then client also check it out
before placing.
| Is This Answer Correct ? | 4 Yes | 2 No |
Post New Answer View All Answers
List out some of the software program that can be useful for architect?
rate analysis hiring of generator 62.5 KVA
What do you mean by tolerance factor of concrete ?
How to determine spacing of bars in slabs or beams
Will going from a 3-tap to 6-tap increase water pressure?
Explain what is the difference between built area and super built up area?
What is the amount of work done by a carpenter, bar Bender and plaster Mason in interior and exterior plaster
how can we construct building without foundation providing only grade beam at ground level
what should be RCC material i.e iron rod(mm)x cement x stone x sand for laying of slab L 42'x B 22'x tk 0.375ft = 1nos & column of H 17'x15"x8" 2nos.
how to create our resume?
What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.
Are cruise ships built for the transatlantic run?
60-70 grade of Bitumen is VG-30 ?
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
what is the procedure of wet seiving. n percentage of silt in different type of soil?