We have received supplies of the ordered material. payments
against the supplies also released. Where ST paid 4%
against form C. Meanwhile it has been observed that 25% of
material supplied was defective. Please suggest whether the
issuance of C form from our side would be stopped till
settlement of liabilities.
No Answer is Posted For this Question
Be the First to Post Answer
wats the procedure to calculate no of batteries for ups?
The simple way of finding the leakage quantity and % in compressed air distribution system
Can you explain about TEE protection scheme?
how to find motors H.P. whout any rating? (only give you a motor and multimeter)
what does the regenerative braking mean?and how it used for Dc motor? thanks.
like the transformer another electrical static device which operate on same priencipal?
13 Answers Power Grid, Vishal Transformers,
which connection is safer series or parallel?usually which connection we prefer at home?
how to calculate fuse rating for a motor
What is the latest generation of circuit breakers called?
What is voltage
Define current?
can i have the methods of speed controls for 3 phase AC MOTORS.