We have received supplies of the ordered material. payments
against the supplies also released. Where ST paid 4%
against form C. Meanwhile it has been observed that 25% of
material supplied was defective. Please suggest whether the
issuance of C form from our side would be stopped till
settlement of liabilities.
No Answer is Posted For this Question
Be the First to Post Answer
How select ELCB for 32amp. socket having quantity 12Nos. We have to do this wiring in PLANT. Please Also explain the incoming cable specification.
0 Answers Gulf Industrial Services Company GISCO,
what does hapen if suddently frequency doubled
how much the voltage & resistance should be ,between earth & neutral points.?& why?
What is difference between MCB,MCCB,ELCB and RCCB? Brief description and why RCCB is costly?
cab we add capacitor bank with generator to improve power factor or not??????
make control wire diagram of start and stop a function with a single push button
he compression ratio for a petrol engine generally lies between
what are the problems faiced at dg comissiong
how to control the speed to switched reluctance motor
how to measure the dc current?
To prevent the mal operation of a differentially connected relay while energizing a transformer, the relay restraining coil is baised with (a)second harmonic current (b)fifth harmonic current (c)third harmonic current (d)seventh harmonic current
How many earthings are required for commissioning the Transformer?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)