Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Befor synchronissation of Generator what test to be carried
out.pl.specify with reason.

Answers were Sorted based on User's Feedback



Befor synchronissation of Generator what test to be carried out.pl.specify with reason...

Answer / vijay

Before Synchronisation mainly three conditions
(voltage,speed/frequency & Phase sequence) has to be
checked which are within the limits. Reason to monitor when
any one on this parameters found not in unique, DG set's
not getting synchronised.
If the synchronisation happened in unconditional status, it
causes unbalance current will flow in the operation and
load sharring is not even. To eliminate this kinds of
occurence Dark lamp test was carried out before execution.

Is This Answer Correct ?    9 Yes 1 No

Befor synchronissation of Generator what test to be carried out.pl.specify with reason...

Answer / kj

Answer one is mostly correct. Two other factors are important. 1) the winding type (e.g. 2/3 or 5/8) as this can affect circulating neutral current. 2) phase angle at time of synchronising must be within limits to prevent high currents to pull DGs into synch.
For answer two - load sharing equipment can allow DGs of different ratings to be used in parallel. Frequency is important not RPM. The number of poles in an alternator can vary requiring a different RPM for the same frequency.
Another important factor iis governor response to load changes

Is This Answer Correct ?    0 Yes 0 No

Befor synchronissation of Generator what test to be carried out.pl.specify with reason...

Answer / benchalli nagaraj

BOATH THE DG'S ARE EQUAL RATING(KVA)
BEFORE SYNCHRONISING THE TWO DG'S TO CHECK 1)BUS VOLTAGE
2) FREQUENCY 3) RPM

Is This Answer Correct ?    0 Yes 4 No

Post New Answer

More Electrical Engineering Interview Questions

how to calc. current for 5MVAR,50hz,33kv

1 Answers  


what is the differance beetwen installation and errection ?

1 Answers  


What do we use in Motor core laminations..???CRGO or CRNGO..and why..????

1 Answers  


If one lamp connects between two phases it will glow or not?

0 Answers  


Starting current of a 10 HP induction Motor is ______ time’s full load current.

0 Answers  


30 kVA and voltage 380/220VAC how to find out kA?

5 Answers  


what is the function of turbo in dg sets

1 Answers  


wat will be the pressure maintained inside the transformer?

2 Answers  


What is a roll of adopter panel in terms of h.t. Panel ???

1 Answers  


what are the components of a start and stop motor control?

2 Answers  


i have been tasked with a design of protection, metering and control(PMC) relay panel extension to accommodate all PMC relays.There is an already existing panel where this one will be built.What are the design aspects for this kind of project? thank you.

0 Answers  


which gas is filled in CFL

7 Answers   Lumax,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)