you are a electrical student, why are you coming for
software job.
Answers were Sorted based on User's Feedback
Answer / rupeshkanak
becouse I am aiso intrested in software tech..and I have
also more knowledge about language of computer such as
c,c++,java wich is also is in my syllabus.therefor I think
I will be success for software job.
| Is This Answer Correct ? | 33 Yes | 16 No |
Answer / tango
Why they have called for the interview if they dont require other than comp and IT people.
It is well known that clearing electrical is much tougher than
IT or computers.
| Is This Answer Correct ? | 10 Yes | 12 No |
Answer / sheena samnani
Sometimes ONE has interest in IT or COMPUTER SCIENCE.but if
marks DOnot PERMIT to get admission in one of the above
branches, then one has to change accordingly. apart from
the personal interest, one can go for software jobs as life
in a software company gets its graph of progressing upwards
and that to in a span which is less than that required by
the core company of electrical branch. so if one wants to
achieve sumthing really fast in lyf then software company
is the best place!
| Is This Answer Correct ? | 18 Yes | 22 No |
what is the principle of tubelight ??? what is the function of starter and choke ???
A mass of 1200g is accelerated at 200 cm/s2by a force. The value of the force required is:(a) 2.4N(b) 2400N(c) 240 kN(d) 0.24N
A 12.5 hp slip ring motor taking high initial current and its MPCB is getting open.what may be the reason?
Explain the experiment on ward leonard method of a speed control on a dc shunt motor with an suitable circuit diagram.
1 amp means-how many electron flow per second. ?
what are the advantages of having high voltage in transmission lines?
In a 3 pin plug holder, what is the purpose of diameter of ground pin is larger than phase and nutral pin
What is the power ratio between power in Star and Delta circuit?
What is bandpass of a transformer?
What is SF6 Circuit Breaker?
is earthing is necessary if we use armoured cable
1 Answers ABB, Schwing Stetter, Siemens,
Double Busbar Scheme for outdoor switch yard system (132kv) step up power plant Hi friends 1. in this system both busbars energized all the time. 2. what is the meaning of main BB and transfer BB, 3. step up transformer connect main bus bar all the time or both BB connected through DS switch . 4.bus sectionalization means ? thank you.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)