you are a electrical student, why are you coming for
software job.
Answers were Sorted based on User's Feedback
Answer / rupeshkanak
becouse I am aiso intrested in software tech..and I have
also more knowledge about language of computer such as
c,c++,java wich is also is in my syllabus.therefor I think
I will be success for software job.
| Is This Answer Correct ? | 33 Yes | 16 No |
Answer / tango
Why they have called for the interview if they dont require other than comp and IT people.
It is well known that clearing electrical is much tougher than
IT or computers.
| Is This Answer Correct ? | 10 Yes | 12 No |
Answer / sheena samnani
Sometimes ONE has interest in IT or COMPUTER SCIENCE.but if
marks DOnot PERMIT to get admission in one of the above
branches, then one has to change accordingly. apart from
the personal interest, one can go for software jobs as life
in a software company gets its graph of progressing upwards
and that to in a span which is less than that required by
the core company of electrical branch. so if one wants to
achieve sumthing really fast in lyf then software company
is the best place!
| Is This Answer Correct ? | 18 Yes | 22 No |
1.what is electricity 2.what is electronice 3.how many modules 4.five electrical component with symbol 5.five electronice componene with symbol 6.how convert 220v.A/C to 24v/DC 7.220V.WAIRING DIAGRAM OF AMMETER/VOLTMETER/OHMMETEER
can u light up bulb with out useing neutral
Sir I hv to fix 20 ton ac how much electrical power need apply?
why a motor rating in KW?
what is range ACB
how to use single phase supply for a three phase equipement.
In our plant we are having 6.6 v motor wih MV drive running frm last two years.udenly at some speed motor getting vey vibrations what is the problem
What are the different pre-commissioning tests that are performed on the distribution transformer, power cable and switchgear (11kv)?
If we have to feed a housing complex having load 8MVA, than what would be the better option, either we first step down 33kv supply into 11kv & than 430v or we proposed no of 33/.44 kv transformer, also which option is economical?
how to calculate the output power of vfd , please help me.
i want to trigger ATS (Mains +Generator )from external system could any body help me in this regard ?? is it posible if yes please tell me how?
Is it advisable to buy a plot for house construction near High Tension Power lines? If it so how much distance it should be away from power line? Iam residing at Chennai, Tamilnadu, India.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)