If i want to build 230kv substation what are the equipments
to be installed?
Answers were Sorted based on User's Feedback
Answer / manoj k mishra
if you want to install 230kv substation you need to have
following equipments....
1.CTs
2.PTs
3.Lighting arresters
4.insulators
5.Transformer for stepping the volatage down
6.Circuit Breakers
7.contactors
8.BUS BARS
| Is This Answer Correct ? | 38 Yes | 8 No |
Answer / raju
First you need good consultent to design a 220kV Substation.
| Is This Answer Correct ? | 21 Yes | 4 No |
Answer / prodip das
Requirement
1.A suitable land
2.Suitable Environment
3.Proper Distance from City or population area
4.Easy communication
5.Efficient Technical manpower
6.X-former(Step down)
7.Busbar
8.Isolator
9.Circuit breaker
10.Lightining Arestor
11.CT & PT
12.Control Pannel
13.PLC(power line carrier)
14.Stone for proper capacitance
| Is This Answer Correct ? | 20 Yes | 3 No |
Answer / viswanathan karthikeyan
Basic Concept :
Incomer
Outgoings
Main Incomer -Cable or OHL LINE -PLEASE CONSIDER
STEPDOWN AUTO TRANSFORMER-220/132kV
NEXT AGAIN STEPDOEN TRANSFORMER-132/33Kv
stepdown Transformer-33/0.415kV
MAIN INCOMER NEED CIRCUIT BREAKER
220KV GIS
132KV GIS
33KV GIS
IF OHL LINE MEANS
gantry
WAVE TRAP
SURGE ARRESTER
COUPLING CAPACITOR
AAAC CONDUCTORS,TOWERS ETC(d0,d2,d6,d9,dt)
CABLE MEANS
220KV CABLE
CONTROL AND REALY PANELS
220,132,33 FOR RELAY AND PROTECTION PANEL
LV,HV,EHV CABLES
EARTHING MATERIALS
EARTHING AUXILLARY TRANSFORMER]
NEUTRAL EARTHING TRANSFORMER
TELECOMMUNICATION PANEL
SCS SYSTEM
BATTERY AND BATTERY CHARGES
EOT CRANE
PUMPROOM
LIGHTING AND LIGHTNING PROTECTION
EARTHING MATERIALS ETC
SO MANY ITEMS REQUIRED
I AM DOING THIS TYPE OF PROJECT
IF ANY DOUBT ,PLEASE SEND MAIL TO ME-vkn.1980@gmail.com
| Is This Answer Correct ? | 12 Yes | 2 No |
Answer / latha
To build a 230kv substation one needs
1.suitable land which is in industrial area
2.step down transformers with proper cooling systems
3.current transformers,potential transformers
4.current arresters
5.buses
6.transmission lines
7.circuit breakers
8.proper earthing facilities
9.skilled engineers,good maintanence faculty
10.control room which consists of relays circuit breakers
for protection scheme
11.air compressor unit
12.batteries and battery chargers
12.contactors
13.GOS
| Is This Answer Correct ? | 7 Yes | 0 No |
Answer / karthik.g
if you want to install 230kv substation you need to have
following equipments....
1.100MVA Transfomer
2.220 & 110 CB,CT,PT,Isolator,C&R Panels,LA,Insulator
3.PLCC equipments (if need)
4.110V & 50 V LT Switchgear
5.110V & 50V Battery & Charger
6.steel structure (for equipment erection)
7.120KN Disc Insulators (Normal)
8.Al.Bus Bar
9.Insulator hardware
10.Bolts & NUts
11.Conductor
12.earth wire
13.connectors
14.Marshaling Boxes & junction Boxes
| Is This Answer Correct ? | 6 Yes | 0 No |
Answer / loruenser
Mind quality connectors, as a very vital part!
| Is This Answer Correct ? | 0 Yes | 1 No |
What is the transformenr turns ratio.
what is the difference between KW and KWh?
How a Universal motor works in Both A.C and D.C? What is the constructional difference with other single phase motors?
what are cable earthing and bus earthing trucks?when and where they are used?
what is the difference between MCCB and SFU in terms of their application?
2 Answers Secure Meters, Tata Teleservices,
what is meant by impulse voltage?
How works the AVR in DG Sets Plz explain??????????
How to calculate the current of Highpressure Mercury Vapour Lamp?what is the basis?whether we have to consider power factor or not?
STATE USE OF ARC RUNNERS & SPLITTERS ?
What is the use of insulation tester and how it is to be used.
In short transmission line,why does the receiving end voltage is less than sending end voltage?
I have raw material for making Compact-Choke for flourscent lamp of 40 Watts. We are suppose to get 0.4 amps output at end. but we are getting 0.42 or 0.44 amps and above. We have done many testings in different but nothing worked out. Please suggest me how to get the correct output. We are using 1. core winding of 700 windings of aluminium 2. E-shape iron fillings and I-shape iron fillings to surround the winding.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)