Answer / manoj k mishra
if you want to install 230kv substation you need to have
following equipments....
1.CTs
2.PTs
3.Lighting arresters
4.insulators
5.Transformer for stepping the volatage down
6.Circuit Breakers
7.contactors
8.BUS BARS
| Is This Answer Correct ? | 38 Yes | 8 No |
Answer / raju
First you need good consultent to design a 220kV Substation.
| Is This Answer Correct ? | 21 Yes | 4 No |
Answer / prodip das
Requirement
1.A suitable land
2.Suitable Environment
3.Proper Distance from City or population area
4.Easy communication
5.Efficient Technical manpower
6.X-former(Step down)
7.Busbar
8.Isolator
9.Circuit breaker
10.Lightining Arestor
11.CT & PT
12.Control Pannel
13.PLC(power line carrier)
14.Stone for proper capacitance
| Is This Answer Correct ? | 20 Yes | 3 No |
Answer / viswanathan karthikeyan
Basic Concept :
Incomer
Outgoings
Main Incomer -Cable or OHL LINE -PLEASE CONSIDER
STEPDOWN AUTO TRANSFORMER-220/132kV
NEXT AGAIN STEPDOEN TRANSFORMER-132/33Kv
stepdown Transformer-33/0.415kV
MAIN INCOMER NEED CIRCUIT BREAKER
220KV GIS
132KV GIS
33KV GIS
IF OHL LINE MEANS
gantry
WAVE TRAP
SURGE ARRESTER
COUPLING CAPACITOR
AAAC CONDUCTORS,TOWERS ETC(d0,d2,d6,d9,dt)
CABLE MEANS
220KV CABLE
CONTROL AND REALY PANELS
220,132,33 FOR RELAY AND PROTECTION PANEL
LV,HV,EHV CABLES
EARTHING MATERIALS
EARTHING AUXILLARY TRANSFORMER]
NEUTRAL EARTHING TRANSFORMER
TELECOMMUNICATION PANEL
SCS SYSTEM
BATTERY AND BATTERY CHARGES
EOT CRANE
PUMPROOM
LIGHTING AND LIGHTNING PROTECTION
EARTHING MATERIALS ETC
SO MANY ITEMS REQUIRED
I AM DOING THIS TYPE OF PROJECT
IF ANY DOUBT ,PLEASE SEND MAIL TO ME-vkn.1980@gmail.com
| Is This Answer Correct ? | 12 Yes | 2 No |
Answer / latha
To build a 230kv substation one needs
1.suitable land which is in industrial area
2.step down transformers with proper cooling systems
3.current transformers,potential transformers
4.current arresters
5.buses
6.transmission lines
7.circuit breakers
8.proper earthing facilities
9.skilled engineers,good maintanence faculty
10.control room which consists of relays circuit breakers
for protection scheme
11.air compressor unit
12.batteries and battery chargers
12.contactors
13.GOS
| Is This Answer Correct ? | 7 Yes | 0 No |
Answer / karthik.g
if you want to install 230kv substation you need to have
following equipments....
1.100MVA Transfomer
2.220 & 110 CB,CT,PT,Isolator,C&R Panels,LA,Insulator
3.PLCC equipments (if need)
4.110V & 50 V LT Switchgear
5.110V & 50V Battery & Charger
6.steel structure (for equipment erection)
7.120KN Disc Insulators (Normal)
8.Al.Bus Bar
9.Insulator hardware
10.Bolts & NUts
11.Conductor
12.earth wire
13.connectors
14.Marshaling Boxes & junction Boxes
| Is This Answer Correct ? | 6 Yes | 0 No |
Answer / loruenser
Mind quality connectors, as a very vital part!
| Is This Answer Correct ? | 0 Yes | 1 No |
How can we calculate the rating of a transformer suppose if load is 1000KW?Formula?
We know flow of electron is current . But why electron flow from negative to positive and current from positive to negative?
can we run 3 phase induction motor under 2 phase supply
can transformer work on dc or not?if we increase the inductance of transformer can it happen to work on dc?
what is the safe meggar values for motor, transformer HT, LT and Cables? IF we want to replace I/C bay at our 220 kv substation which is of 140 mw load capacity bay to be replaced by 400 mw capacity bay.other than CT(1200/1) what are the other equipment i have to replace. why we generally use 3.5 core cable or in other word 1/2 core for neutral and also confirm me that in balance conditiob(3 phase)current in neutral will zero
What is technical difference between ELCB & ELMCB?
What is function of condenser in fan?
you have an automatic voltage regulator at home for your appliances,if the voltage in your area drops from 220v to 190v,does the output of the automatic voltage regulator drops?or does it retains the 220v output?
can we install HT panel & LT panel side by side or how much clearance is required ?
Why and when NGR panel required. Is it necessary to design a NGR panel for a 6.6kV Alternator paralleling with Grid????
what we happen if 400 kvar cpacitor banks are on in manual mode and there is no load on mains ??????????????
how to electronic energy metter failed in electomagnectic fild passing in the metter and which thing to defect more on metter.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)