Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

If i want to build 230kv substation what are the equipments
to be installed?

Answer Posted / prodip das

Requirement
1.A suitable land
2.Suitable Environment
3.Proper Distance from City or population area
4.Easy communication
5.Efficient Technical manpower
6.X-former(Step down)
7.Busbar
8.Isolator
9.Circuit breaker
10.Lightining Arestor
11.CT & PT
12.Control Pannel
13.PLC(power line carrier)
14.Stone for proper capacitance

Is This Answer Correct ?    20 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the criterion for selecting vector group of Transformers ? i mean how to decide vector group of Generator transformer, substation trasformer and transformer at consumer end

2419


whati s the sludge current in ups

2302


why the neutral point in connnection oscillates?

2323


what's the requirement of Dy11d0 connection of 3 phase transformer?what's use of it?

8042


how can we select the appropriate VCB ?

2372


explain why core loss of a transformer is almost constant under different load conditions when connected across a constant voltage and constant frequency.

2764


33kv Rated output avilable in market (any where in india)

2136


what is the soft starter principle? how is connection diagram? what is the procedure for checking the connection?

2220


Control cables in S's will carry 1000v which is AC R DC? Pls answer meĀ 

2205


I am getting above 60 V as open delta voltage against single phase unit ICT at tertiary delta formed and ICT getting trippped on NDR. ICT tested and found in order. PTs provided on tertiary are tested and in order. what may be the reason?

2175


in single phase converter, the no.of scr's conducting during overlap a)1 b)2 c)3 d)4

2115


what is the requirement regarding earthing of Single conductor with AWA

2328


What is the difference between isolators and electrical circuit breakers? What is bus-bar?

1196


Hoe do calculate the Cable size for Amps rating ?

2212


Draw a circuit diagram in which if button is open we can use socket and bulb as a series test circit and if button is close than simple we can use socket as any load purpose.

1929