Advantage of Aluminum form work in terms of activities can be skip and cost too
No Answer is Posted For this Question
Be the First to Post Answer
per 1 cumt concrete how much manhours is required including shuttring,steel etc.,for slab & foundations
what motivates you to do a good job
1 Answers Flextronics, HPCL, ISRO,
relation bet Coefficient consolidation Cv, time factor Tv, drainage path d, & time t is Cv=d2Tv/t Cv=d2t/Tv Cv=tTv/d2 Cv=Tv/td2
How many cement sand ballast in cc 1:4:8 40mm
IS sobha developers ,bangalore an good place to work for the freshers
how water proof chemicals act in concrete to avoid leek?
0 Answers DDF Consultants, NSL,
Rate analysis of 150mm, 100mm, & 230mm thk BBM work
In two way slab where should we stop the work at end of the day?
how to know 28 day strength of concrete knowing 3 day or 7day strength of concrete???
for 100 sqm cement concret (1:2:4) 4cm thick floor,the quantity of cement required is
Using 1 lit paint how many sq.ft of wall we can paint. Thanks.
koi bta sakta ha ka steel ko calculate krna ka full mathod pls
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)