How do you compute volume of airflow?
No Answer is Posted For this Question
Be the First to Post Answer
Sir please Bhel Enigineer trainy test papaers in civil engineering
what are the differences between shear wall and column
4 Answers BM, L&T, University of Gondar,
how much steel is required foe following components.. footing- plinth beam- column- beam- slab-
Anyone have sample questions for bhel interview.please send me as Iam appearing for the interview on 19th sep2008. Kindly send this to my e-mail: arun_prasath_n@yahoo.co.in
Why Vitrified tile are getting pop up.
waht is the angle of reposae
how to tie 10 legged stirrups
How much qty. of cement used for laying 1 Sq.Meter of tiles(600mmx600mm)
how many bricks,cement,sand of a 40*30*6 ft bowndry wall?
6 Answers Natco, NGO, OGDCL, SIL, Simplex,
19. Are you a team player?
What are the benefits of rcc pipes over steel designed pipes?
1 building project (work in progress) and following are sum detail about his project 1) Using local rebar grade 415 2) Total built up area- 60000 sq.ft 3) Floors to be constructed – 21 storey 4) Estimated requirement of Steel per sq. foot – 7KG/sq.ft 5) Concrete grade – M35 6) Rebars mainly required (sizes)- 16,20,25,32 & (8 mm for stirrups) Wanted to ask u if this person uses 500D…what are the benefits he will be getting? Whether his per Sq. foot consumption can b reduce? If yes den around how much?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)