bridge design

Answer Posted / nsk

First we study about the location, catchment area and
preliminay survey after that if necessay to provide the
bridge. we go to soil investigation and study the report,
afterthat design.

Is This Answer Correct ?    8 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are the responsibilities of a construction manager?

771


When was the first motorway built in england?

642


can we make bricks using m10 grade cement concrete and what would be the ratio of raw materials used and price per brick ?

2056


What is the difference between linear dimension and aligned dimension?

629


How many square meter can a worker/labor demolish a structure per day?

1510






how much deduction will be in 32 mm dia HYSD steel bar for 45 and 90 degree bend

1591


Is it worthwhile to carry out tests on particle density of soil particles for geotechnical design?

660


any book or article on pumped concrete.

1721


what is difference between NP2 NP3 NP4 CONCRETE HUME PIPES USED AT SITE

3591


What is bmc stands for in bmc software?

658


1.what type of the rock is most suitable for wet mix macadam in construction of road? 2.what is the highest maximum dry density and optimum moisture content can be acheive by using most suitable crush rock?

2016


What is proportion of PCC Grade G?

1586


what are the types of dimensioning?

1727


Pls explain me about tension and compression in a flat slab

1583


Bernaullis theorem deals with the law of conservation of mass momentum energy none

1575