Answer Posted / nsk
First we study about the location, catchment area and
preliminay survey after that if necessay to provide the
bridge. we go to soil investigation and study the report,
afterthat design.
Is This Answer Correct ? | 8 Yes | 0 No |
Post New Answer View All Answers
What are the responsibilities of a construction manager?
When was the first motorway built in england?
can we make bricks using m10 grade cement concrete and what would be the ratio of raw materials used and price per brick ?
What is the difference between linear dimension and aligned dimension?
How many square meter can a worker/labor demolish a structure per day?
how much deduction will be in 32 mm dia HYSD steel bar for 45 and 90 degree bend
Is it worthwhile to carry out tests on particle density of soil particles for geotechnical design?
any book or article on pumped concrete.
what is difference between NP2 NP3 NP4 CONCRETE HUME PIPES USED AT SITE
What is bmc stands for in bmc software?
1.what type of the rock is most suitable for wet mix macadam in construction of road? 2.what is the highest maximum dry density and optimum moisture content can be acheive by using most suitable crush rock?
What is proportion of PCC Grade G?
what are the types of dimensioning?
Pls explain me about tension and compression in a flat slab
Bernaullis theorem deals with the law of conservation of mass momentum energy none