If we use oil,inner on the column box, it'll make rust on
the column steel?
Answers were Sorted based on User's Feedback
Answer / abhijit
Oil is applied on the shuttering which is used for columns.
This helps in easy removal of the shuttering.
Steel would not rust because of this oil.
Is This Answer Correct ? | 12 Yes | 2 No |
Answer / g.aravinda kumar
oil applying to shuttering sheets and before placing of the
shuttering to the column, tie the cover block to the column
reinforcement due to this to avoid the oil will not touch to
the column reinforcement.
Is This Answer Correct ? | 10 Yes | 0 No |
Answer / rrr
oil does not cause steel to rust, its only makes easy to remove shuttering, oil acts as a protective layer to steel so exposed steel railings are coated with oil paint to protect, if oil is present in RCC steel please clean before concreting it acts as debonding agent between steel and concrete.
Is This Answer Correct ? | 6 Yes | 0 No |
Answer / sunil
oil can be used in plates before placing the column box, and also we can use cover blocks to prevent touching to the column steel
Is This Answer Correct ? | 0 Yes | 0 No |
plastering ratio 1:3
what is the shuttering normal clear cover for footings, walls, beams & columnms
component parts of a weir
4 Answers Infosys, L&T, Zamil Steel,
if water absorption is more than 25 percent in brick, what is the defect in it?
form work including the props can be removed from beams only after
How many type thickness vibrator used in concreting,,?
how much M-25 steel reinforcement per cubic meter in commercial building as per IS code
what is the formula for calculating concrete in circular column ? pls explain with diagram add a link for diagram
what is mix design of sand cement and and aggrigate of M10 M20 M25..
i know that, the for calculating material required for concrete volume of concrete is taken 50-54 % more for wet volume. i have querry is that cement and sand volume taken more for making wet volume but in the case of aggregate why it is taken more there is no change in aggregate whether it is dry or wet.???? can you give me answer for this???
why reinforcement is not provided at centre for beams r column
Manpower required for de shuttering of conccrete slab