Why hydropower stations are preferred solution for meeting peak loads in grids?
No Answer is Posted For this Question
Be the First to Post Answer
What is the meaning of dedicated earthing?
Determine the minimum cable size for a 28A single phase final sub circuit originating from the distribution board supplied by three phase submain. The route length of the final sub circuit is 54 m. Assume 1% voltage drop in the consumer's mains. Submain specification: Cable: 50mm2 4 core V75 copper; Route length 42m; Maximum demand 135A per phase
which plant has high load factor
why are we adopting 132kv,220kv for transmission rather than using 440kv at all transmission lines as it gives lower losses?
What is means by MacAdam Ellipse?
What is meant by Reactor in power system and what are the uses?
Why delta star trformers are used for lighting loads?
for a 33/11kv transformer, after step down what happens to the balance 22kv.
which transfofrmer oil break down voltage strength get will be more if oil sample taken from bottom of tank or oil sample taken from top of the transfomer tank.
why wire sizes are 3/29 or 7/29 and why not wire sizes are 2/29 or 6/29?
Describe the test procedure to determine the vector group
In Delta connected capcitor bank, One bank failed due to some problem. Can we connect Open delta capacitor bank to 3 phase motor. The motor voltage rating is 6.6KV. IF yes what changes will happen?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)