how many brick sand cement require (1:5) 1 cum
Answers were Sorted based on User's Feedback
Answer / m.a. haleem akmal
473 Bricks, 0.232 cum Fine sand and 1.31 bags cement
Is This Answer Correct ? | 10 Yes | 1 No |
Answer / jayanth
1/(.2*.1*.1)=500 Bricks
qty of cement=1*1.5*1444(density of cement)/6=361kg
sand=1805
Is This Answer Correct ? | 4 Yes | 2 No |
Answer / ajayzarbade
total no of bricks=500 nos with inc. wastage
& 1cu.m bk.work 33% dry morter then ratio will be use 1:5 so
1/6=0.166m3/0.035
Is This Answer Correct ? | 0 Yes | 0 No |
How to design 12*12*14 room having rrc slab ,coloum, beam,foundation?
what"s the formula to find the cement,sand,aggreegate(45mm) requirement for PCC?
what is meant by point of contraflexure?
what are the major benefit in auto level?
flow of fluid takes place viscosity compressibilityu surface tension deformation under shear force
strenth of brick
What you understand by building codes?
how to calculate steel in slabs ?
What is the different kinds of support?
why 50% more is assumed while calculating dry volume of coarse and fine aggregates in concrete calculations.whether 50% more is correct? How is it decided? whether the same is applicable to cement volume. Also what about cement mortar dr volume? How much more is to be considered for dry volume of mortar.
10. Do you remain in good relationship with your previous employer / company where you no longer work /?
In earth work 1300 cum soil how to calculate how many liters require in water