I want to know how much the lapping length for the pilecap reinforcement.. we r using single pile cap which is 24mby54m and 2.5m depth.. total 91piles are supporting the pile cap.. how to do a steel reinforcement??
No Answer is Posted For this Question
Be the First to Post Answer
how many cubic centimeter in one unit of sand?
1.how to calculate 4*3 runner qty in cft. 2.how to calculate the nails qty.(column,beam,slab) 3.if any formula for binding wire qty calculation.
how to calculate 1:1.5:3 ratio concrete cement, sand, metal and water please give me brief calculation
5 Answers DLF, Sobha Developers,
Define Who designed the city of Washington DC?
What is the maximum allowable wastage in pouring of Ready Mix Concrete received at location with transit mixtures. Work scope includes both Direct Pouring & manual pouring.
1 Answers AKM Construction Management,
Define what is quality...
what is Tsunami. explain it's formation.
Why do we use stirrups in columns?
16 Answers Rishi Infra Projects,
How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?
how to calculate the amount of cement & sand required for plastering
How to calculate the load of partion in flat slab if we use brick?
0 Answers CE, Mahalaxmi Developers,
What is the difference in design between Working Stress method & Limit State Method ? Briefly Explain.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)