Suppose a new brick wall is being constructed,and the
courses and not aligned horizontally,what negetives can it
cause?
Answer / ratheesh
Causes:
1. Crack il be found in the wall.
2. plastering thickness il be more.
3. Room dimension il be change.
4. If its load bearing wall, its won't take lode properly.
Is This Answer Correct ? | 4 Yes | 0 No |
what type offoundation suitable for clayey type soil
Terms Name the bars which is used in beam and colume ? Like starter bar etc.
when we select buildup beam
DEFINATION OF CIVIL ENGINEERING
where will be the reinforcement of slab placed when there is an inverted beam and the bottom of the beam and slab are at same level ?
How much percentage of brick bats allowed in CD-75 bricks
how to calculate the 45 degree bent up length. if we given that whether the total length of the slab reinforcement will increase or not. mantion it clearly please. this is for bar bending schedule purpose?
Common strng of kg/m3 building materials
what does '415' in FE415 stands for??
Laying bitumen concrete 40mm thick using 0.1372 cum of 13.2 10mm metal ,0.2387 cum of 10 5mm metal...what did it means please explain me how much cum of 10 mm metal need?
As per ratio 1:4:7, how can we calculate the quantity of materials for 1 cum of concreate, pls derive with equation
What is the withdrawal force of steel nails?