what is the minimum cement content for M20 & M25 as per is code -456(2000).
Answer / Manish Kumar Jain
The minimum cement content for M20 and M25 according to IS Code 456 (2000) are:n- For M20: 180 kg/m^3 (or 18% by mass of total concrete)n- For M25: 225 kg/m^3 (or 22.5% by mass of total concrete)
| Is This Answer Correct ? | 0 Yes | 0 No |
Hi.. Can i get hel in finding HPCL previous year question paper? plz help me in finding thiss..
how to calculate the quantity of steel in a slab , beam and coloumn
1.how to calculate the nails qty in shuttering of column,beam, shear wall. 2.how control the binding wire wastage in building project. 3.
what are the compressive strength requirements(in 7 days & 28 days) of cement sand mix used for plastering purpose (Cement:sand-1:6)? Kindly give the IS Code reference also.
while measuring slab for concrete Quantity it is practiced that steel quantity is not deducted in that particular qty.why?
can we make bricks using m10 grade cement concrete and what would be the ratio of raw materials used and price per brick ?
What is the OMC and MDD for subgrade (soil),Granular Sub Base, wet Mix Macadam in your project?
how did find the quantity of cement ,sand , and aggregate in concreat which is givan by volume
How do you to separate Marble and Granite. What are difference between them?
Will going from a 3-tap to 6-tap increase water pressure?
what r the precaution for high in atp tempareture,low in atp tempareture
cement mortor 1:5 for 30 m2 12 mm tk plastering so how to calcualte its rate
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)