what are the compressive strength requirements(in 7 days &
28 days) of cement sand mix used for plastering purpose
(Cement:sand-1:6)? Kindly give the IS Code reference also.
Answers were Sorted based on User's Feedback
Suppose a new brick wall is being constructed,and the courses and not aligned horizontally,what negetives can it cause?
Please explain soil invistigation methods?
what is the quantity out-put by Hitachi-200 breaker for breaking or how to calculate
How to Calculate no.of bricks in 1sq.mtr
How did street originate in the plumbing term street ell?
What are the precautions needs during concrete pouring in very hot weather?
What is the best type of wood glue?
Why we check specific gravity of admixture when we receive it? What is it's significance.
WHAT IS MEANT BY STABILITY?AND WHY CHECK STABILITY TEST METHOD IN THICKNESS SIDE?
how tl calculate lap lengh of concrete in different grade of concrete.
Difference between P.C.C and R.C.C?
24 Answers Amit Enterprises, D Link, SAT, Surya Constructions,
What is the difference between Backfilling & Refilling in Earth Work Group Item ?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)