Granite is greater in strength and resistant to stains,acids,scratches,heat,etc...whereas marble have lesser strength and sensitive to acidic products in comparison...
Is This Answer Correct ? | 12 Yes | 0 No |
Answer / vijay kumar
Granite is one of the hardest materials on earth. Granite
is composed primarily of quartz, feldspar and mica. Other
minerals may be present in the stone creating its unique
colors, textures and patterns. Used as a countertop
material, it is resistant to scratches, acids, stains and
heat. It is long-lasting, durable and available in a wide
variety of colors, textures and unique crystal patterns
that create a warm and inviting environment for you kitchen
or bath.
Marble works beautifully especially in the bath where the
veining patterns and colors that appear can be used to
create exquisite designs. Marbles are made up of mostly of
calcite. Marble is sensitive to acidic foods such as
vinegar, lemon, tomatoes, wine, as well as some tile
cleaners, mildew removers and other materials commonly
found in the kitchen or bath and will dull a polished
finish.
Is This Answer Correct ? | 8 Yes | 0 No |
how to calculate 1 cubic meter rcc concrete 1:1.5:3 ratio ,how much aggrates and sand , quanitites
Describe the role of independent Quantity surveyor?
Which is the direction for positive angle?
What is the difference between chamfer and fillet?
How to calculate quantity of cement , sand and granite from concrete mix ratio and volume of work
what is the water cement ratio of 1:6 and 1:4 cement sand mortar. reply soon
what is the ingrediants of wet mix macadam?construction procedure?
WHAT IS THE IMPORTANCE OF FLY ASH BRICK?
For 1 bag cement how i will calculate sand and metal aggregate;Here the mix proportion is 1:2.49:2.38
What is the graphical relationship between N - Value of soil and Dia. of pile when pile length is fixed, and n - Value and length of pile when its dia. is fixed.
design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal
For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)