For 12mm thick and cement plastering 1:6 on 100sqm new Brick work the quantity of cement required is
Answer / bugti.ghalib@yahoo.com
V=100*0.012 = 1.2 cum
in plaster volume increases by 33% then
dry volume = 1.2*1.33 = 1.596 cum
Cement = 1.596*(1/7)*1440 = 328.32 kg
hint: 1440 kg/m3 is the density of cement, 1 is the ratio of cement and 7 is the total sum of ratios
No. of bags = 328.32/50 = 6.56 bags ie.one bag of cement= 50 kg
sand = 1.596*(6/7)*35.28 = 48.26 cft ie. 35.28 = (3.28)3
| Is This Answer Correct ? | 3 Yes | 1 No |
one MT of steel for using how much binding wire required?
What is geopolymer based concrete?
Manpower required for de shuttering of conccrete slab
What are the Design Mix proportion,and where they are used
How much stirrups spacing required for.column reinforcement?
3 Answers L&T, Ocean Interiors,
what pressure the NP2 class RCC pipe can sustain?
What is anchorage length
what is the minimum spacing required for slab & beam reinforcement
for pretensioning which will yield first and same for post tensioning?
1.Why we are preferring 43 grade cement than 53 grade cement. 2. Approximate cost difference between 43 and 53 grade cement. Thanks.
what is difference between open and well foundation ?
what is the lap length on column? state the farmula plz with explaination.
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)