For 12mm thick and cement plastering 1:6 on 100sqm new Brick work the quantity of cement required is
Answer Posted / bugti.ghalib@yahoo.com
V=100*0.012 = 1.2 cum
in plaster volume increases by 33% then
dry volume = 1.2*1.33 = 1.596 cum
Cement = 1.596*(1/7)*1440 = 328.32 kg
hint: 1440 kg/m3 is the density of cement, 1 is the ratio of cement and 7 is the total sum of ratios
No. of bags = 328.32/50 = 6.56 bags ie.one bag of cement= 50 kg
sand = 1.596*(6/7)*35.28 = 48.26 cft ie. 35.28 = (3.28)3
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
what is w/c ratio in dry lean concrete for m10 mix design
What is the amount of work done by a carpenter, bar Bender and plaster Mason in interior and exterior plaster
what is hydrostatic paradox?
How do you measure water flowing through 300mm diameter pipes?
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
Mention different types of roof systems?
How do you maintain water pressure?
What is oneside mat. And explain
The portion of a brick cut across the width is called?
States some of the tool bars used in cad?
For submitting the project loan for bank Residential bldg,Suppose we take Provinding RCC mix 1:2:4 for footings No of footings,length ,Breadth,Height ,qty in cum, at last unit/Rate(Rs) ,i would like to know how do we get the unit/Rate
in one hour , one 200 excavator , how much quantity (mcube)can load ? soil is not hard not soft
how to calculate the rebar depth if forgot the foundation reinforcement (main steel)? is that any calculation or formula we have data sheet of supplier what depth what is the pull out capacity is mensioned in data sheet. if any IS code than its help full to me.
How and where are aqueducts built?
How to calculate ventonite bag in pile ( pile depth 25 m dia 1m)