Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


what is the proportion of M200 &M300 grade concrete



what is the proportion of M200 &M300 grade concrete..

Answer / pijush12

M200=1:1.5:3 (200 kg/cm2)
(m=20)
M300=design mix follow

Is This Answer Correct ?    24 Yes 12 No

Post New Answer

More Civil Engineering Interview Questions

How to avoid fly ash seed ball formations in the concrete mixer while mixing of raw materials for fly ash block manufacturing?

0 Answers  


sir my site not availabele 12mm steel now if i use 10 mm how many spacing require for slab design slab thk 200mm footing, column,raft,wall how can calculate give me formula

2 Answers   Amrapali,


My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).

0 Answers   L&T,


Why shoring is employed in building industry?

1 Answers  


What are the techniques to measure road difference?

0 Answers  


which grade of concrete is the strongest? M20,M25,M30,M35 or M40?

41 Answers  


How many no of bars in a bundle of steel and kgs/bundle. 8 mm, 10mm, 12mm, 16mm, 20mm with both MS and TMT separate.

15 Answers   ABC,


In footing (mat) if two different dia of rods are to be used which rod should be placed at top and bottom ( eg. 10mm & 16mm dia rods)

7 Answers  


what is the least-count of plane- table,dumpy,theodolite,compass,tachometer?

15 Answers   L&T, THDC,


Trapezoidal footing length = 2m , B=1.7m D=0.5m and d- 0.15m. Can anybody help and calculate quantity of concrete by explaining all formulas involved.

16 Answers   Reliance, Siddhi Constructions,


we are use us steel in PQC road

1 Answers   Student,


what is the creep in concrete

4 Answers   L&T,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)