How can I check the quality of
sand,brick,and aggregateat site without
using any labouratory test?
Answer / pranav panchal
For sand: -
Take it in ur hand if you find more clay content in the sand then its not good for concrete work, sand must be free from grass and other impurities likes clay clots, roots, round stones.
For bricks:-
Take 2 bricks and stuck them if you get sound like ring bell then its good.
take 5 samples and leave them one by one from the height of the 1 mt, bricks must not be broken nor get cracked.
For aggregate:-
Must not be more flaky, rounded, must have angular corners and must be free from the dust
| Is This Answer Correct ? | 13 Yes | 1 No |
how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?
sir tell me what are the rules to find out the cut length? and what is the deduction in dia to be made ?
i am completed my b.tech EEE in 2009,,,iam trying the job 3+ for AUTO CAD (ELECTRICAL),, what is the market for autocad electrical in hyderabad... how to handle the intervws give some suggestions ?
i want to make this calution for making a buliding but i dont know the formula for this and also how much cement concrete an sand use for this calculation,calculation is below(100ft lenths 75ftwidth and 100mm thikness)plz brife the calcution thanks
What are the various load combination in Limit state method?
2 Answers Developer Building Contracting, DMRC, Engineers India Limited,
The company is following same question pattern and giving same questions in all year for all batches from the starting of company they didnt even able to frame new question,,so guys if u want to place in cccl just mail me i will send the questions....ramyakvb@gmail.com....if u mug all those answers u will be selected no proper selction procedure is considered so it is better to place in some other company...All The best dont attend cccl
Define block?
what is the Purpose of Adding 20% of wet mortar & 1/3rd to Dry Mortar for PCC & Plastering & Rcc .is there any standard method for adding this .?
how do we calculate quantity of cement , sand and aggregates in 1 m3 of M30 grade concrete ?
31 Answers ABES Engineering College, Gammon, Jalanidhi, NCC,
what is the basic fundamental of contouring?
Middle point of any slab is raised 10-12 mm during shuttering work because––
which is code is used for design of steel structure
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)