How to calculate cement and river sand material Qty for waterproofing base coat and finish coat
No Answer is Posted For this Question
Be the First to Post Answer
What is OSHA compliance?
What is the soil bearing capacity ? And how it should be to built a multistory building ?
3 Answers Clancy Networks, eConstruct, UltraTech,
what is labour consume factor in residential projects
What is the correct position of lapping splice of reinforcement steel bars in a beam at top & bottom of the beam?? what is the reason for this location?..what are the factors affecting lapping location in beam?
Design a rectangular channel.
0 Answers CSI, Engineers India Limited,
for gravel roads in India to get 1feet height how much height we have to fill
How long does it take concrete to harden?
For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)
RR masonry rate analysis
1 cubic meter contains how many bricks
47 Answers Guru Tech, Krati Enterprises, L&T,
Quick setting cement's setting time?
7 Answers TNPSC Tamil Nadu Public Service Commission, UPPSC Uttar Pradesh Public Service Commission,
How to make tiles floor step by step procedure?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)