How to arrive dry volume of concrete (1.52 to 1.57) ?
No Answer is Posted For this Question
Be the First to Post Answer
how many litr. of paint will required for 1 sqm area of wall(internal wall and external wall) ??
How foundation is designed, Column design and beam design
what is coping?
11 Answers GKC Projects Limited GKCPL, Technical Construction, Vijai Electricals,
tell me quantitys of matal, sand and cement in 1:4:8 and 1:2:4
9 Answers AVL, Infosys, NCC, SPCL, Swapnapurti Developers,
Q:What is the formula of bar to bent the slab in bent slab? Second question Q: what is formula to calculate the hook?
how to find the diameter of steel bar from steel area
What is quantity of cement and sand required for 2000sqft of tiling?
why are use steel with conc. instead use of other type materials.
4 Answers College School Exams Tests, Prathima Group,
How long does it take concrete to harden?
how to control PQI (Project Quality Index)
whatis the minimum strength required for M-25 grade concrete in 14days compressive test? What is the procedure of calculation?
Can anybody please tell the procedure to calculate the quantity of admixture in Self Compacted COncrete??
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)