Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


why mixing marble powder reduces setting time of cement

Answers were Sorted based on User's Feedback



why mixing marble powder reduces setting time of cement..

Answer / faruk

Limestone powder or marble powder can improve the denseness of the hardened Portland cement paste due to its filling effect(it basically acts as a filler material).

"The hardening of concrete/cement before its hydration is known as setting of concrete" or "The hardening of concrete before it gains strength" or "The transition process of changing of concrete from plastic state to hardened state. Setting of concrete is based or related to the setting of cement paste. Thus cement properties greatly affect the setting time(setting time reduces)

Is This Answer Correct ?    0 Yes 0 No

why mixing marble powder reduces setting time of cement..

Answer / surya

marble powder observe some water so faster at the same time cement setting time reduce

Is This Answer Correct ?    0 Yes 1 No

why mixing marble powder reduces setting time of cement..

Answer / muneebkhurshid92

reasoning

Is This Answer Correct ?    0 Yes 6 No

Post New Answer

More Civil Engineering Interview Questions

Did any of the egyptian pyramids ever fall down?

0 Answers  


How much cost is required for 1 Flyash Brick?

1 Answers  


a rectangle grill of length 72 inch x 20 inch width.how to calculate bar spacing ,bar consist 8 mm thickness and spacing of bar is 2 inch.. calculate no of bar with formula

0 Answers  


why shear is not considered in limit state of serviceability??

1 Answers  


15mm thick plastering 1:4 what is the cement consumption per sqm

6 Answers   Well Care,


what is the minimum grade of concrete used in rcc(reinforced cement concrete)

8 Answers   Lok Sewa Aayog, Prestige,


What is the best design for building bridges?

6 Answers  


how to prepare Steel schedule or Bar bending schedule.

1 Answers  


Please tell me vasthu room sizes. Thanks.

0 Answers  


What are the advantages and disadvantages of using plastic and timber fenders?

0 Answers  


How to repair the Pavement quality conc used for toll plazas if is giving hungry look or honeycombed ? how much cement need to treat 100sqmtr of Damaged PQC

2 Answers  


plz tell me the compresive stength of genral con. & foam con. all grade after 7,14,21,28 day

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)