In Rcc work what ratio we need?
Answers were Sorted based on User's Feedback
Answer / adesh kumar
The ratio of R C C work has to be following mix proportion, that is nominal mix:
Cement:Sand:Aggregate-
M 15(1:2:4),
M 20(1:1:5:3),
M 25(1:1:3)
| Is This Answer Correct ? | 2 Yes | 0 No |
what is the types of surveying?which type of survey carrying for type of work?
how many express way in india
what is difference of NP3 and NP4 pipe and what is the thickness of 1000mm dia NP4 pipe
For G+4 storied building having 76000 sft per each floor, can you prepare schedule in such a way that structure should be completed with in 41/2 months and finishing be completed with in 51/2 months?
how to find quantity of concrete in PCC M15
at the beam-column junction point tell me how much beam bars should pass through column ring ? 3 or 2 or 1 . answer with reason. if it is not happen then what will be he effect ?
what is tensile strength?
What is semirigid connections?
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 600 microns?
what is fineness modulas of sand ?
How to test the soil compaction test?
How many times one TMT bars bents & straight upto not broken the bar.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)