Answer / adesh kumar
The ratio of R C C work has to be following mix proportion, that is nominal mix:
Cement:Sand:Aggregate-
M 15(1:2:4),
M 20(1:1:5:3),
M 25(1:1:3)
| Is This Answer Correct ? | 2 Yes | 0 No |
i m a btech 1st year student of civil branch. i want to do mba in future after having some work experience in civil field.is there any mba course made exclusively for civil engineers?
what is water cement ratio and how to calculate it after designing the concrete?
What are the common ways of demolition?
what is minimum steel area required for rcc slab
what is M & 20 of M20 concrete
11 Answers Bharti, Sheladia Associates, URC Construction,
what are the types of footing
what is modular brick and it size
why we leave expansion joint between to complex
difference between specification and method of statement
steel which is used for reinforcement and structures why they are directly used why GALVANISATION or PRIMER is not done to prevent from corrosion
How to find Weathering Course Material
Sir what reason the deshuttring of column 1 day after casting and slab deshuttring time 14 days after casting
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)