Camber of 15 mm is to be provided at free end of the cantilever what dose it mean??
Answer / ram mahidhar reddy
Camber is nothing but slope
It mean that a slope of 15 mm should be provided across it's length
| Is This Answer Correct ? | 0 Yes | 0 No |
advantages & disadvantages of using crusher dust instead of sand in r.c.c work
3 Answers L&T, Shm Consultants,
While painting,if the gypsum is the first coat to seal holes on wall,It said to have tendency get away with all other coat. What is the solution on that?
what is difference in chemical composition between fe415 and fe500
apparatus of soundness test of cement
in 1:4,1:6 and 1:8 cement mortar mix how much water required? and find water cement ratio?
How to calculate carrying capacity of the existing water supply trunkmain
Moisture content calculation for diff mix ratio's ??
The point of contraflexure occurs in
which is code is used for design of steel structure
how many bag of cement needed for concreting 14.93 m3 at the ratio of 1:4:6 and 1:5:6
Cost control in civil construction as well as Quality control
how to calculate water cement ratio?
6 Answers IVRCL, Saroj Group, Sobha Developers,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)