Camber of 15 mm is to be provided at free end of the cantilever what dose it mean??
Answer / ram mahidhar reddy
Camber is nothing but slope
It mean that a slope of 15 mm should be provided across it's length
Is This Answer Correct ? | 0 Yes | 0 No |
how to calculate detail quantity of bricks and mortar for 500 cu.ft masonry work. consider wall thickness 9 inches
how to calculate the dry wt of sand and cement for a required design mix?for ex:M20
0 Answers Bhugan Infracon, UltraTech,
what is mean by bleeding of concrete
4 Answers Afcons, Habib Group,
What will be the angle for hook in column ring for column size 600x750 mm bar size 10mm for ring
200mm*200mm thick block work 1sqm how many cement bags
Why the height of the bridges over the river are very low?
Draw the cross section of a boundary wall and label its part with detailing?
how i can tak Quantity of mortar in block work
how we can calculate a bentup hook in difreeent angles.for exp.at 90 degree,45degree,60 degree..
what is the meaning or full form of 12T13 cables used in prestressed bridges
How to calculate laplength for 3 floors
What is a BBS?Find out the cutting length for a 600*600 foundation with 50 mm cover