what is the problem not getting 7 days slab cycle in Mivan
formwork? what is the output of mivan carpenter per day?
Answers were Sorted based on User's Feedback
Answer / er nitin lahane
Per day work for 1 carpenter is minimum 10 sqm per, I.e your shuttering area is 3250sqm you completed work in one day you are required 325 carpenter.you complete work in 8 day you required 40 carpenter per day. Ok
Is This Answer Correct ? | 2 Yes | 0 No |
At present which is the latest and best technology for waterproofing in India 1) Roof waterprofing, 2) Basement waterproofing and 3) Toilet waterproofing
what is the requierd compressive strenth for m 20 grade concreat for 7 days?
Pl let me know approx. Rcc construction cost per sq.Foot for Building a house with2800 sqfeet carpet area in pune city
How do you compute the volume of airflow?
How we can calaculate materials required for block work(1m3) block size 33cm x 20 cm x 17 cm, mortar 1:6
what is BOQ? BOQ IS US IN ESTIMATE
What is the ratio of M40 Concrete?
Kindly tell me a book name to study for BIS exam
Which foundation is stronger, Pile or Standard?
Standard weighs for different grades of concrete?
which is the cheapest type of flooring (say for using for 6 months in a factory building & dismantling it)?
What is Reason of Alkali-Silica reaction in Concrete mix and its remedies?