1.How much strength will be attained for M30 grade of
concrete after 28 days?
2.Is it attain 30 N/mm2 or target mean strength?
Answers were Sorted based on User's Feedback
Answer / bidyut dey
1.after 28 days it will be attained 30 N/MM2
2.Terget mean strength
| Is This Answer Correct ? | 29 Yes | 4 No |
Answer / ganaaji harsha
M30
Target strength for mix proportioning
f’ck = fck 1.65 s
Where
f’ck = Target average compressive strength at 28 days,
fck = Characteristic compressive strength at 28 days,
s= Standard deviation
From Table 1 standard deviation, s = 5 N/mm2
Therefore target strength = 30 1.65 x 5 = 38.25 N/mm2.
Target Mean Strength for M30 ( IS 456)
Fck 0.825*Standard Deviation
30 0.825*5
34.12
| Is This Answer Correct ? | 15 Yes | 1 No |
Answer / chandrasekhar j
1.30 n/mm2
2.it is target mean strength
| Is This Answer Correct ? | 11 Yes | 7 No |
Answer / shubham singh
1: M30
Target strength for mix proportioning
f’ck = fck + 1.65 s
Where
f’ck = Target average compressive strength at 28 days,
fck = Characteristic compressive strength at 28 days,
s= Standard deviation = 5 (IS 10262:2009, table 1)
From Table 1 ( IS 10262:2009, Clause 3.2)
f’ck = 30 + 1.65 * 5
= 38.25 N/mm2
2: It should attain target mean strength
| Is This Answer Correct ? | 3 Yes | 1 No |
Answer / aditya mayekar
1.after 28 days it will be attained 30 N/MM2
2.Terget mean strength
| Is This Answer Correct ? | 2 Yes | 3 No |
qty. of cement & sand required (100sq.mtr) for fixing of floor and wall tiles also fixing of marble stone on the floor
how do understand the plinth beam croos section diagram
how much the volume of one packet cement ?
How do we test on design and style in a software?
How many types of traps are used?
how to test the quality of bars???
How many steel is require in one cubic meter area?
what is the development length?
What are your future hopes for this job?
What is a projection line?
how many blocks required for 100sqft 8" blocks
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)