I found a crack on a slab in my resi.bldg.There must be a
leakage.what shall i do for preventing the leakage?

Answers were Sorted based on User's Feedback



I found a crack on a slab in my resi.bldg.There must be a leakage.what shall i do for preventing t..

Answer / sandeep kumar satapathy

Firstly spot that area where the leakageis formed,remove the plaster over the slab and then check is their any cracks on the slab if yes then make a V shape cutting over the cracked person and then make some treatment by chemical or Epoxy grouting and again do plaster over there.

Is This Answer Correct ?    13 Yes 0 No

I found a crack on a slab in my resi.bldg.There must be a leakage.what shall i do for preventing t..

Answer / venkata raghu

First remove the slab plastering from the portion of lekage place the cement water with leak proof oil and make replaster to the slab . check if there are any other cracks

Is This Answer Correct ?    4 Yes 4 No

I found a crack on a slab in my resi.bldg.There must be a leakage.what shall i do for preventing t..

Answer / vivek

If the crack is on the concrete then take a V groove and prefer epoxy grouting. Then proceed for water proofing on the concrete area where grouting has done. Then plaster the surface.

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

what means if slump is less than 25mm and greater than 80mm?

7 Answers  


what is meant by camber

1 Answers   NCC,


how to calculate amount of materials for concreting and plastering?

3 Answers  


asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream

1 Answers  


what happened if the diameter of capillary tube is double then the capillary rise will be

7 Answers   Bhel,


Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??

1 Answers   RS Construction,


How to calculate plastering for elevated water storage tank

1 Answers  


what is the maximum number of course that can be laid according to IS code and the max height.

1 Answers  


how pumping of concrete effects the quantity of material used in it?

1 Answers   SJM,


wat is the optimum mix design for M25 grade of concrete ? is the ratio 1:1.5:3.65 correct?

7 Answers   ACC,


what is detail procedure of eccentric footing? plz. give solved exmple?

1 Answers  


What are the techniques to measure road difference?

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)