Answer / bhupendra
simple the manhole shape have circuler but longitudinally it shape have paraboliv .firs we find the circumference both ends and take everage .then multiply it with width & height.
| Is This Answer Correct ? | 30 Yes | 8 No |
what is the difference between weir and a barrage
12 Answers AAI Airports Authority Of India, CIT, TCI Constructions,
foundation details for 25 ton weight Furnace on 2 supports and 2 tilters
what is specific gravity of soil?
I had a plot of say 5000 sq.ft. and soil in the plot is normal soil. Now I had to work upon the tender quantities to prepare a preliminary budget within a day. Is there any thumb rule or assumptions to calculate the quantities which can differ upto 15% +/-?
difference between limit state method and working stress in terms of load
What is labour ratio for construction of residential buildings
The horizontal distance between parallel main reinforcements in RC slab shall not be more than
1 Answers BEL, BSL, L&T, Mrkr Constructions,
what is the procedure for batching plant calibration??????
1)What is swear, swage and storm water? 2)What are the sizes of bricks based on Nominal, practical and standard? 3) What is the distinguies between the grade of cement 43, 53?
WHAT IS YOUR EXPECTED SALARY?
0 Answers ADITI, Allfon, Amazon, Ralph Lauren, Starbucks,
best hand book for civil engineers with practical criteria
what do you know that m20,m25
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)