how to carry out rate analysis for RCC work in column using M20 ?
Answer Posted / rajasekar
cost of M20 concrete and concrete mixing labour.The labour part may change from place to place.If it is hand mix, we have to consider the lead and lift of material.Shuttering and steel not to consider in the concrete volume.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
If we don't have drawing for Excavation of building,At what rule we will go for excavation and how much depth will go for a villa?
rate analysis for cement pointing 1:4 , for 100 sq m
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
How to construct a water sump in a rocky soil?
how to calculate the length diamond shaped striupps in column
What is componsation
contractor receive 100 MT steel.after compliting the work the contractor refund 90 MT steel.How reconsilation of steel done?
Required concret Surface Temperature prior to coating of epoxy pain with references ASTM or ACI whatever
please give me the rates of RCC(CUM), PCC(CUM), Brick Work(CUM), Tile Flooring, Saria Shuttering
How much is the cover for slab?
how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you
a butt weld is specified by
. Write a C program to perform following functions:- a. Declare one integer variable of all the storage classes. b. Print all the variables without assigning any values in tabular format. a. The tabular format must contain the variable name, type, storage class and printed value on the screen in RED color.
What is the biggest dam in america?
Define What happens to Load at yielding ?