How to estimate the shuttering material requirement for a slab and beam and shear wall..?
Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)
No Answer is Posted For this Question
Be the First to Post Answer
WHAT IS THE LAP LENGTH FOR COLUMN WITH DESIGN MIX M-35 RCC
7 Answers Omaxe, Shoba Devlopers,
if a 1 storey building is constructed without columns&beams and having the thickness of walls 12" in which cement&sand mortar is used what is the lifespan of building
0 Answers Ryna Facilities Services,
In few lines, please be elaborative on extras and talents that make you a potential candidate for the post:
Anyone have sample questions for bhel interview.please send me as Iam appearing for the interview on 19th sep2008. Kindly send this to my e-mail: arun_prasath_n@yahoo.co.in
what are the tests conducted on cement,aggregate and concrete?briefly explain that tests procedure and limits adopted for safety side.
what do you calaculate PCC/GRADE 10
how many bricks consume for one cft with wastage
what is the density of concrete & steel? where we are using pycnometer? what is bulking of sand? what is under reinforced & over reinforced? what is balanced section?
What is reinforced brick masonary and its advantages and applications, arrangement of steel
cement constant for brick works
bend deductions for reinforcement for wall
B.M DIAGRAMS & S.F DIAGRAMS OF CONTINOUS BEAMS
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)