What is the quantity of cement in mix m20 concrete?
No Answer is Posted For this Question
Be the First to Post Answer
how to draw road profile
deshuttering time for RCC for DPC over the foundation.
WHAT THREE SPECFIC JOB POSITIONS TO YOU TARGET FROM THE COMPANY?
specific gravity of block cotten soil, normal, rockysteta
types of laps in column
suppose that 156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.
How to calculate measurement box size for M25 grade cement?
3 Answers Perunding Omega PMC,
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
What is Lean Concrete?
Ehat slump test of column & retaing wall.
How to come 1.54 from dry to wet concrete?
in 2 way slab can additional compressive reinforcement can be provided if yes than in which conditions it is required ?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)