factor which affects design of concrete mix
Answers were Sorted based on User's Feedback
Answer / uday tank
Types of cement
Moisture contain of sand
Impurity of water, sand, aggregate,
Curing of concrete wore
Indicial and final setting time of cement
Quality control of work
| Is This Answer Correct ? | 15 Yes | 3 No |
Water cement ratio, gradation,quality of aggregates, grade
of cement(33/43/53) etc.
| Is This Answer Correct ? | 12 Yes | 1 No |
Answer / k.jeganathan
1.Cement content
2.W/C Ratio
3.Size of aggregates
4.Shape of aggregates
5.Type of Admixture used
| Is This Answer Correct ? | 10 Yes | 1 No |
Answer / himanth kumar
There are so many factors namely
Design strength of concrete required
Type and grade of cement and used
Grading and strength of Aggregatrs
Method of Placing either Pumpable, Termie, or Droping
Water cement ratio
Aggregate cement ratio
Type and purpose of admixture used
Degree of Quality control needed
Type of Curing.........etc
| Is This Answer Correct ? | 5 Yes | 1 No |
What is the quantity of steel, cement, sand, and aggregate required for a 2100 sq ft Roof Slab(Residential Building) area of RCC?
what is the meaning of 40/20 src
difference between high rise & multistoried building?
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
what is the weight of 12 mm 40 mm aggregate?
The portion of a brick cut across the width is called?
which chemical is used for corroded steel
how bitumen is prepared for NH,SH &other roads
what is escalation?how it is done?
how we can prevent freshly laid concrete from rain ,, What the plastering thickness for a) inner brickwork b) outer brickwork c) beams & slabs
how to take concrete quantity for precast segment for viaduct project?
what is crimping and cripling?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)