Can any colleague send me the steel frame pictures of roofs,
beams, columns, footings, roof bends, door bends etc. I shall
be very gratefull.Suhail_akhter@hotmail.com
No Answer is Posted For this Question
Be the First to Post Answer
how much binding wire is reqd for 1 MT
how much CM required for Random Rubble masonry in CM 1:6
define prestressing? compare prestressing with post tensioning?
how is calculate the developement length of column such like as L
How many bricks,sand,cement in 1m3 bricks masonary
3 Answers Ascent, Superior Hi Tech,
Differenciate between One way slab and two way slab
What is the difference between the concrete mix design carried out by IS10262 and by ACI method ?
how can we calculate the amount of concrete in trapezoidal footing?
How to calculate canal slope curvature qty!
How to design a beam without any typical(tuff) calculation. Answer Only by using site practical knowledge?
what is the stripping time of beam?
To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)