How many no of cement bags required to do the concrete with
the proportions 1:1.5:3 for 4inch thickness for 100 sqft?
Answers were Sorted based on User's Feedback
Answer / balvinder bhagat
Convert area of slab (100sqft)into sqm = 100/10.76
=9.29 sqm
(as 1m2=10.76 sqft)
thickness (4 inch) =.1m
Volume =9.29*0.1 m3
=0.929 m3
As in 1:1.5:3 for 1m3 no.of cement bags =8 bags
Therefore,tot. no. of bags =0.929*8
=7.43
~8 bags.
Is This Answer Correct ? | 32 Yes | 2 No |
Answer / azhar
take the coeff. of 1.52 per cum for dry material for each
like cement, aggregate & fine aggregate (coarse sand) and
calculate the particular qty Ex. Cement=1.52/(1+1.5+3)
*1= .... Cum
One Cement bags volume (50 kg) = 0.032 cum
Is This Answer Correct ? | 11 Yes | 3 No |
For plate load test why we are applying pressure 3 times the proposed allowable bearing pressure? Is there any supporting standards for this?
What is the difference between M20 and M25 concrete?
RCC colums of 15"X9" each, roof height 10.5'ft, total pillars 12 nons. Span between pillar to pillar is 14/20/20 length wise and 17/14 width wise. Total Slab area 2400 sft and plinth area is 1900 sft. beams are 12"X12". kindly calculate load factor per sqft.
2 Answers ABS Construction, L&T,
What is gauge and gage?
what is FPS brick
I got a concrete base to do 2200 x 2200 x 150 mm can you tell me how to calculate the quantity of cement to use
There are two buildings one taller and one shorter whose time period will be grater and similarly the frequency ?
How to find the thickness of RCC concrete ex.10'x10'. what"s the thickness, we provide and what"s the formula?
WHAT IS THE LAP LENGTH FOR COLUMN WITH DESIGN MIX M-35 RCC
7 Answers Omaxe, Shoba Devlopers,
How many square meter can a worker/labor demolish a structure per day?
what is the 0 value in quantity surveying
how much aggregate need for 1:4:8 p.c.c in 1sqm area?