Answer / muhammad akram
Total Mass of Workshop = 10,000 Kg
Sq.ft of Work shop structure = 1300 cu.ft (Estimated)
Red Oxide required = 25 Liter
Top Two Coats = 50 Liter
| Is This Answer Correct ? | 0 Yes | 1 No |
Curing time for 1)R.C.C slab 2)B.W 3)Plastering
what is the standard gradient or slope for drainage?
whats the field test of cement,aggregate and water
does the compressive strength of brick be more then 3.5 n/mm2 or 5 n/mm2?
what do u mean by shear?and tension?
6 Answers L&T, Shoba Devlopers,
How much lap length provided in compression and tension in bridges?
why cracks develop at the upper corners of doors openings
I want to construct 1850 square ft of rcc apartment , with stilth parking , the site requires 18 ft of pile foundation , the apartment will be above ground parking , can some one guide me about the cost of construction of such structure in Pune ?
why the profile of shell of natural draught cooling tower is hyperabolic.
Which IS code is saying the detail of deshuttering period?
what u mean by shoring?
How to calculate the quantity of cement in Cement Mortar M10 Concrete using 40mm metal
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)