Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


you are planning to paint a newly fabricated workshop
building made of structural steel of 10 tons total mass.you
are require to paint 1 cot of primer and 2 coats of top
coat.How many liters of primer and top coat you will request

Answers were Sorted based on User's Feedback



you are planning to paint a newly fabricated workshop building made of structural steel of 10 tons..

Answer / muhammad akram

Total Mass of Workshop = 10,000 Kg
Sq.ft of Work shop structure = 1300 cu.ft (Estimated)
Red Oxide required = 25 Liter
Top Two Coats = 50 Liter

Is This Answer Correct ?    0 Yes 1 No

you are planning to paint a newly fabricated workshop building made of structural steel of 10 tons..

Answer / laxmi

50litres primer, 1 litres top coat

Is This Answer Correct ?    1 Yes 8 No

Post New Answer

More Civil Engineering Interview Questions

Curing time for 1)R.C.C slab 2)B.W 3)Plastering

0 Answers   PCC,


what is the standard gradient or slope for drainage?

1 Answers   IGC, SPL,


whats the field test of cement,aggregate and water

6 Answers  


does the compressive strength of brick be more then 3.5 n/mm2 or 5 n/mm2?

3 Answers   L&T, Modi Builders,


what do u mean by shear?and tension?

6 Answers   L&T, Shoba Devlopers,


How much lap length provided in compression and tension in bridges?

4 Answers  


why cracks develop at the upper corners of doors openings

1 Answers  


I want to construct 1850 square ft of rcc apartment , with stilth parking , the site requires 18 ft of pile foundation , the apartment will be above ground parking , can some one guide me about the cost of construction of such structure in Pune ?

1 Answers  


why the profile of shell of natural draught cooling tower is hyperabolic.

0 Answers  


Which IS code is saying the detail of deshuttering period?

3 Answers  


what u mean by shoring?

2 Answers  


How to calculate the quantity of cement in Cement Mortar M10 Concrete using 40mm metal

1 Answers   bscpl,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)