minimum spacing of bars in column????as per code...???
Answers were Sorted based on User's Feedback
Answer / mayur kashmire
Acc.to IS 456:2000.....the min. dist.between RIF will not be less than-1)bar dia. for equal bars
2)the larger dia. for unequal bars
3)25 mm.
| Is This Answer Correct ? | 1 Yes | 1 No |
Answer / rakesh bhojapure
150mm and it is depend upon load on column, Diameter of bars.
| Is This Answer Correct ? | 0 Yes | 1 No |
how many cement used in single story residential building per sqft
0 Answers Matrix PMC Consortium,
16 questions out of 55 were from the book GUPTA N GUPTA OBJECTIVE of civil engineering. Total ques were 4 ques from hydraullics, 7 from BMC, 4 FROM SOM, 4 from soil mechanics, 6 from transportation, 5 from engineering drawing.
Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?
what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?
What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.
how to clculate the %of concrete strenght achive after curing?load
0 Answers L&T, RJ Construction,
13. What are your expectations from this possible relocation to our company?
Required concret Surface Temperature prior to coating of epoxy pain with references ASTM or ACI whatever
What is the density of most of construction materials?
If we use oil,inner on the column box, it'll make rust on the column steel?
Bitumen grades are 30-40,60-70, 80-100. what is mean by 30- 40
10 Answers ACC, Awasthi Construction, Bitulink, Mir Akhter Hossain, SOT,
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)