Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

minimum spacing of bars in column????as per code...???

Answer Posted / honnikery-007

minimum spacing of bars in column is75mm

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the crank length in the slab?

1049


What are the uses of layer?

1301


Name the main components of a cad gui?

1487


how to calculate labour strength for work for RCC,brickwork,blockwork,in &out plaster,flooring,dado,door frame & shutter,painting etc for constructing highrise building?

3803


At one time what is the height of Lift for concreting for Bridge Piers Class B Loading and refer the code.

2169


can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com

2490


what are the Task work of different labour.?

2616


to draw bm diagrams for portal frames under different loadings//

2965


I was once rejected for US visa in early August. But now I'm going again for interview next week. What are the chances that I will faced the same VO????

2239


pls mail some more tecnical qustions at msaranya2610@gmail.com

2086


I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.

2019


How do you measure water flowing through 300mm diameter pipes?

1111


I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.

6058


Specific gravity of cement?

1637


what is Quantity of stone and sand required for one cubic meter of stone work (UCR)

2077