minimum spacing of bars in column????as per code...???
Answer Posted / hatif sabri
8mm
| Is This Answer Correct ? | 0 Yes | 5 No |
Post New Answer View All Answers
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
Why should pumping be not used in case of concreting work?
CAN V USE CRUSH SAND FOR CLAY BRICK MASONARY
How to take labor charges for construction of 1cum of concrete?
What are the different methods for drawing an arc?
in 100 cft = 1350 bricks in 100 cft = ? bloks
Mention different types of roof systems?
Can rice husk ash be used instead of coal fly ash for manufacture of clc/ foam concrete
what are the values of compressieve strenght?
What is gravity flow?
1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25
How to determine dia of steel for use in column,slab etc. i mean how to calculate the diameter of steel which is to be used in structures.
show answer/calculate mix 1:2:4 ratio -cement-sand -metal-water
Sir how to find cutting length for footing steel bars in the shape of "u"