Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


a revised estimate is prepared when the original estimate
has exceed by more than
1 percent
2
10
18.40

Answers were Sorted based on User's Feedback



a revised estimate is prepared when the original estimate has exceed by more than 1 percent ..

Answer / jatin

10%

Is This Answer Correct ?    11 Yes 1 No

a revised estimate is prepared when the original estimate has exceed by more than 1 percent ..

Answer / pardeep kumar

More than 2%

Is This Answer Correct ?    0 Yes 5 No

Post New Answer

More Civil Engineering Interview Questions

rasio for outer plaster thickness for wall

7 Answers   L&T,


Mixing of cement, sand & stone chips with oil will not give strength because ––

2 Answers  


I have used the proportion of cement:sand:gravel, is 1:2:4. cement and the sand was provided by the company but i provided the gravel. this combination was used to fill 500 cubic ft of wall. now i want to know how much gravel was used in making the wall. can you guys please help me?

2 Answers  


lap lenth

5 Answers  


How do I calculate the ground is resested for a 5 floor building?

3 Answers   L&T,


how to calculate load for a bungalow and 1column carry how much load if the size of column ,9"*15" .....or total structure load......

0 Answers   Vishwakarma,


What is a kip?

0 Answers  


what is the least-count of plane- table,dumpy,theodolite,compass,tachometer?

15 Answers   L&T, THDC,


satart to end steps by step process of building construction...? i want to planning theme accuretly

0 Answers  


How to evaluate the elastic modulus of soil from the plate load test result? for example ..one of test results are here Max. settement =4.56mm(at 900kPa) Residual settlement = 4.02mm Maximum pressure on soil 900kpa Soil bearing capacity 300kpa Plate diameter=300mm Thickness =25mm Soil description =Grey, clayey silty SAND with gravels and rock fragments

1 Answers  


how to reduce heat of hydration in concrete?

2 Answers  


how much cement and sand required for 100sqm of wall plastering in different proportions

0 Answers   Bharti, Pvr Constructions,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)